• Login
  • Help/Guide
  • About Trac
  • Preferences
  • Wiki
  • Timeline
  • Roadmap
  • Browse Source
  • View Tickets
  • Search

Context Navigation

  • ← Previous Version
  • View Latest Version
  • Next Version →
  • Last Change

WorkPlan/CoreModelEvolution

Version 3 (modified by andrew, 7 months ago)

--

Core Model Evolution

Description

Usage

Example:

To be decided

Breakdown

  1. FLIM/N-Dimensions Short Term Solution
    1. #59 FLIM (days)
    2. #112 N-Dimensional (days)
      • Planing Meetings (1.5 days x 5)[0.5 days x 5 so far]

Download in other formats:

  • Plain Text

Trac Powered

Powered by Trac 0.11.5
By Edgewall Software.

Visit the Trac open source project at
http://trac.edgewall.org/